
How we arrange your structural warranty
Tell us about the project, we prepare the proposal form with you, insurer quotes usually come back within one working day of a completed proposal, then the provider inspects the build and issues the certificates.
- Instant response
- Insurer quotes usually within one working day of your proposal
- UK FCA Regulated Broker
- New build, conversions, social housing and retrospective
- We fill in the proposal form with you
The short answer
You tell us about the project, we prepare the provider's proposal form with you and get quotes, and once you accept, the provider registers the site, inspects the build at key stages and issues a certificate for each home at completion. Start before work begins on site if you can.
Timeline
How long each step takes
| Step | What happens | Usual timescale |
|---|---|---|
| 1. Your enquiry | You send the basics by the form, a call or WhatsApp. You get an instant reply with your reference. | Instant |
| 2. Our call | We talk through the site, the build and the cover you need, and say what the providers will want to see. | Usually the same working day |
| 3. The proposal form | We fill in the provider's proposal form with you from your drawings and answers. You check it and sign it. | As soon as we have your answers and drawings |
| 4. Quotes | The providers review the proposal and quote. You get a written quotation with every cost shown separately. | Usually within one working day of a completed proposal |
| 5. Registration | You accept, pay the provider and the site is registered - ideally before work starts. | When you are ready |
| 6. Inspections | The provider's surveyor inspects the build at key stages. | During the build |
| 7. Certificates | Once each home is finished and signed off, the provider issues its certificate and the cover runs from then. | At completion |
We do the paperwork
We prepare the proposal form with you
A warranty proposal form is long and detailed. Most developers would rather not fill it in from scratch, so we do it with you. Send us what you have - drawings, the ground report, a few answers by email, WhatsApp or on a call - and we fill in the form and only ask for what is still missing.
You then check every answer and sign it. A few questions - about past claims and insurance history - you always answer yourself.
Best time to start: before work begins
Register before work starts on site if you possibly can. The provider can inspect from the foundations up, more providers will consider the project and it is usually cheaper. Already started? Talk to us anyway - see retrospective cover.

What we need from you
Information for a structural warranty quote
This is what providers usually ask for. Send what you have - we can usually tell you early which providers are interested and what else they will want.
- The site address and planning reference
- The number, type and size of homes or units
- Architect's drawings and elevations
- The build cost and your planned start date
- Who is building it, and their experience
- A ground investigation report and topographical survey
- Structural engineer's drawings and calculations, when ready
- For a conversion, a survey of the existing building
- Whether a lender or funder has asked for cover, and by when
- If you have started: photos and building control records so far

Inspections and certificates
What happens during the build
The provider appoints its own surveyor, who inspects to the provider's technical standards. The surveyor is separate from building control, although the two often look at the same stages. The visits usually include:
- foundations and drainage, before they are covered
- the superstructure - walls, frame and floors
- the roof structure and the building made weathertight
- completion, before each certificate is issued
If the surveyor finds something that needs putting right, it is dealt with on site and signed off before the certificate is issued. Keep every certificate safe - buyers, their lenders and conveyancers will ask for them, sometimes years later.
How it works - questions
How long does a structural warranty quote take?
Every enquiry gets an instant reply, we usually call the same working day, and once we have your completed proposal and drawings, insurer quotes usually come back within one working day.
When should I apply for a warranty?
Several weeks before work starts on site. It keeps more providers interested, lets the provider inspect from the foundations up and is usually cheaper than cover arranged afterwards.
Do I pay anything before I accept a quote?
No. Our quotations are free and there is no obligation. Our modest broker fee is only charged on success - if we do not arrange your cover, you pay us nothing.
Will my buyers' lenders accept the warranty?
Most mainstream lenders accept warranties from the main providers, but each lender decides for itself. We check each provider's lender acceptance before you choose.
Start with step one
Tell us about your project in under a minute and we will take it from there.
- Takes under a minute
- Instant reply by email with your reference
- Insurer quotes usually within one working day of your completed proposal
- Sites anywhere in the UK - and the Channel Islands and Isle of Man through Island Warranties
Already filled in a proposal form? Email it to us or send it on WhatsApp with any drawings you have and we will take it from there.
